Through the generosity of a community, GCS raised the funds necessary to pave the school driveway and parking lot. The project began to take shape through the schools facility committee as it prioritized projects for the school. This one rose to the top for several reasons. First, the cement slab from the old Nickerson School was becoming very slippery and some injuries occurred on the surface. Second, the existing tar was wearing beyond repair which would eventually would